At the time of the planning application no EIA was required as the project was under the EIA threshold and cumulative impacts were at that point not a major influencing factor.  New energy hub Director Vicky Portwain managed the planning application and Inquiry and supported the construction manager through the build phase.

Project Factfile:

  • Number of turbines: 2
  • Turbine Manufacturer and Model: Nordex N60
  • Turbine Capacity: 1.3 MW
  • Site Megawatt Capacity: 2.6MW
  • Grid Connection: 33kV substation onsite
  • Date of planning application:
  • Date of first generation: 2008
  • Key Challenges: physical site constraints, neighbouring residential amenity