At the time of the planning application no EIA was required as the project was under the EIA threshold and cumulative impacts were at that point not a major influencing factor. New energy hub Director Vicky Portwain managed the planning application and Inquiry and supported the construction manager through the build phase.
Project Factfile:
- Number of turbines: 2
- Turbine Manufacturer and Model: Nordex N60
- Turbine Capacity: 1.3 MW
- Site Megawatt Capacity: 2.6MW
- Grid Connection: 33kV substation onsite
- Date of planning application:
- Date of first generation: 2008
- Key Challenges: physical site constraints, neighbouring residential amenity